Sealants for Windows, Doors, Roofers, Rain Gutters, Patio Covers, Pools and More

Here we feature our most popular installation sealants & supplies for Installers, Professional Contractors and DIY’ers.

You require building materials you can depend on and know will allow you to complete a project
in full confidence. Sealants that are easy to use, easy to clean and
will give your installations the long lasting seal you and your customer depend on.

You need affordable prices that will allow your projects to be more cost
effective.

MK Building Materials has “Your best
prices for cases of Sealants, Insulation Foam, Vinyl Flat Trim, Coil Rolls and
Mouldings.

We Offer items by the Case,
Multi-Cases, Pallets and ½ Pallets.

Ask us about our tiered volume discounts when you know you’ll need many cases.

Call Us Now For a Quote: 714-822-1875 or 714-660-6062

BOSS ®  125 MULTI-SEAL

14 Colors - *Paintable

A Hybrid multi-purpose, one part sealant, formulated with USP™ Technology to form a highly durable, flexible seal. This unique sealant offers outstanding primerless adhesion to most common building materials including vinyl, aluminum, steel, concrete, wood, glass and asphalt shingles.

9.5 oz. Cartridge & 20oz Sausage

Windows, Doors, Gutters, Metal, Flashing, Wood,

Masonry, Joints and More.

  • All weather plastic cartridge ·       

  • Applies the same in all seasons ·       

  • Bonds to wet, damp surfaces ·       

  • VOC Compliant · 

  • Bonds to Kynar 500*      

  • Paintable in under an hour.

  • AAMA Certified.

    Test small area for compatibility before painting, *Translucent not paintable.

Link to short Boss125 Rain Simulator video:

BOSS ® GUN FOAM CLEANER

  • Specially developed to clean the PU foam applicator guns.

  • A Correct cleaning of the gun and the proper use of the product will ensure an optimal function and prevent blockage of the applicator gun.

  • Suited for cleaning of the valve and spray nozzle of PU foam canisters and removing uncured PU foam.

12 oz. Gun Can

SOUDAL® DOOR & WINDOW FOAM

Formulated with CFC free propellant. A one component, self expanding, ready to use polyurethane foam, with a plastic adaptor head for use with a foam applicator gun which contains propellants which are completely harmless to the ozone layer.

AAMA 812-04 Approved
24 oz Can Gun Foam

GENIUS GUN PATENT NO. 1010639

  • Filling of cavities

  • Creation of a soundproof screen

  • Installing of window and door frames

  • Sealing of all openings in roof construction

  • Mounting and sealing of window and door frames

  • Connecting of insulation materials and roof construction

  • Application of a soundproofing layer on motors  

  • Improving thermal isolation in cooling systems

Titebond® UA920 SEALANT

12 Colors including Clear - Paintable

Titebond UA 920 sealant is a high-performance, urethane acrylic formula which eliminates shiners, reduces dirt pickup and has great UV resistance. It requires no priming or mixing and provides an airtight, water-resistant seal. It remains permanently flexible and spans gaps up to 2" wide. Paintable.

Windows, Doors, Siding & Trim Sealant.

  • VOC-compliant in all 50 states

  • Perfect for interior window seals

  • Dust & dirt resistant

  • Available in 12 colors and Clear.

  • Easy water clean up

    Paintable - 12 Colors White, Black, Clear, Medium & Dark Bronze, Gray, Clay, Almond, Woodtone, Dark Brown, Tan, Beige.

Meets AAMA 808.3/800% Elongation/ Adhesive or Sealant Use (50Yr Warranty)

Ideal for:

Sealing Around Siding, Windows and Doors / Interior/Exterior Sealant for Nearly any project.

Seals:

Siding / Windows / Doors / Concrete / Metal / Wood / Most Common Building Materials.

Ultra Low VOC - Compliant in all 50 states. Joint Movement capability +25%

Weather Resistant

Paintable 2-4 hrs after application.

Ideal for both indoor and outdoor use.

10.1 oz. Cartridge

When it comes to sealing seams and cracks around windows, doors and siding, H2U’s advanced formula delivers better adhesion, flexibility and durability than most sealants in its class. Formulated for flexibility, it provides 25% joint movement -- making it ideal for new construction that will likely experience settling. Made of a UV and water-resistant formula, H2U will not crack or yellow. It is dust- and dirt-resistant, cleans up easily with soap and water and paintable when fully cured. Ideal for both indoor and outdoor use.

10 oz. Cartridge

Windows, Doors, Siding & Trim Sealant.

  • GreenGuard Certified

  • Perfect for interior window seals

  • Dust & dirt resistant

  • Available in clear or white

  • Easy water clean up

OSI H2U

Clear & White

BOSS® 385 Silicone

Clear & White

Mildew Resistant

Plumbers 100% RTV Professional Grade

Max. Performance Silicone

The Gold Standard

A premium Tub & Tile Plumbers 100% RTV silicone is a one-part, fungicidal, silicone rubber sealant, designed to seal nonporous surfaces around ceramic tile, showers, tubs, sinks and plumbing fixtures where conditions of high humidity and temperature extremes exist.

9.5 oz. cartridge

This product is mildew resistant for

use in moist or humid locations such

as bathrooms and lavatories.

  • Mildew resistant, non-yellowing silicone

  • Waterproof and remains Permanently flexible.

  • Use around the toilet base, showers, sinks, bathtubs and tiles.

  • Excellent for gluing ceramic and

    porcelain tiles and tub surrounds to the wall.

  • Cures to a tough, rubbery solid at room temp.

  • Excellent resistance to weather, temperature extremes, and caustic environments

  • Plumbing Fixtures

  • Painted Areas

  • Flexible, mold-resistant seal

  • Excellent adhesion to glass.

    Remains Flexible

    VOC Compliant

    Resists Moisture/ Staining/Spotting.

    Resists Humidity & Temp Extremes.

Titebond® Ultimate MP

Superior Polymer Technology

"Premium-grade, Superior Polymer" Paintable.

Exterior/Interior

Roofing, Windows, Wood, Masonry, Concrete, Brick,

Drywall, Metal, Kynar, Glass, Wood, PVC.

  • Sealing around window and doors

  • Sealing around Flashing, Vents

  • Sealing around General Roofing

  • Sealing Vinyl Siding.

  • Sealing anywhere a weathertight seal is desired

50% Joint Movement capability. Permanently flexible.

Weather Resistant tight seal. Never Cracks.

*Sausage and Cartridges available in most colors.

Watch Brief Video Above.

Designed for both interior and exterior use. Forms a tough, flexible, resilient bond to all building material surfaces including Kynar. It has excellent resistance to water, weathering.

Cures to produce a flexible seal.

9.5 oz. cartridge & 20oz Sausages

Titebond® Pro-Grade+

White

Acrylic Latex With Silicone.

Designed for both interior and exterior use. Multi-purpose, siliconized acrylic latex caulk. Easy to use formula dries quickly, will not cause shiners and cleans up with water. Offers great weather resistance, a water-resistant seal once cured, tools easily, and can be painted in 2hrs. Contains no phthalates and offer unbeatable adhesion to most common building materials including wood, metal, glass, tile and more. 50Yr Warranty

10.1 oz. cartridge

"Painters Caulking." Interior/Exterior, sealing joints, repairing cracks, back filling gaps. Seals Wood, Masonry, Concrete, Brick, Drywall, Metal, Glass, plastic, fiberglass, aluminum, plaster, most building materials.

  • Sealing around window and door frames

  • Sealing around baseboards

  • Sealing around trim

  • Sealing anywhere a weathertight seal is desired

  • Sealing corner joints

  • Sealing where siding meets trim

BOSS® 185 Multi-Seal

Outstanding Bond Strength

White

A one component, high performance adhesive/sealant formulated with USP™ technology. Provides excellent durability, maximum adhesive strength and is VOC compliant in 50 states. It is color stable and UV resistant (non-yellowing) and contains no isocyanates solvents halogens or acids. It is a moisture curing sealant that remains flexible, even at low temperatures with quick grab strength and excellent adhesion to various substrates such as aluminum, steel, glass, wood, brick concrete, mirrors and many plastics. It is also paintable with most latex paints.

9.5 oz. Cartridge

  • Fast Cure

  • Quick Grab

  • Formulated with USP™ Technology

  • VOC Compliant

  • UV resistant and color stable

  • Paintable with most latex paints

  • Can be applied on wet surfaces

    Great For:

    ** Mirrors, Aluminum, Steel, Glass, Wood, Brick Concrete, Many Plastics.

BOSS® 399 Silicone

Water Proof SEAL

Clear & White


A one part, neutral curing, medium modulus sealant formulated for window and door glazing market. It offers a primerless adhesion to vinyl, wood, aluminum and Kynar 500®

10.1 oz. Cartridge

  • 100% Glazing - Professional Grade

  • Formulated for the WIndow & Door Glazing Market

  • VOC Compliant in all 50 States

  • Low Odor

  • Excellent backbedding Sealant

  • Medium Modulus

  • Primerless Adhesion

  • Bonds to Kynar 500®

  • AAMA Certified

BOSS® 850 Colors

Trans White

Color Matching Silicone for Surfaces

9.5 oz. Cartridge

  • Mildew Resistant

  • Excellent Adhesion

  • Remains Flexible

  • Will Not Shrink

  • Adheres To Many Nonporous Surfaces

  • Excellent for sealing and waterproofing shower-tub enclosures, tubs, sinks and around urinals

  • Ceramic Tile Grouting

  • Seals Cultured Marble or Natural Stone and Granite Seams

  • Excellent for Sealing Back Splashes in Bathrooms or Kitchens

  • Great for adhering cultured marble panels to sheet rock

  • Meets FDA/USDA requirements for use in establishments operating under Federal Meat and Poultry Inspection Program.

Great for:

Cultured Marble, Glass, Countertops, Natural

Stone, Granite, Porcelain, Painted Surfaces,

Plumbing Fixtures,

SOUDAL/BOSS® Family

Multiple Applications

Polyurethane/Silicone for a Variety of Applications

Cartridge & Sausages available.

SOUDAL/BOSS Pro Family of Sealants for All your Building Material Needs.

  • Fire Stop Sealant and Gun Foam

  • Elastomeric Sealant 100% Flexible.

  • Building and Construction Joints

  • Kitchens & Bathrooms

  • Windows and Doors. Inside & Out.

  • Windows & Door Gun Foam

  • Foam & Gun Foam Cleaner

  • Tube, Shower and Tile.

  • Gutters, Roofing.

  • Mirrors and Glass

  • Countertops, Stone, Concrete, Marble, Porcelain sealants.

  • Polyurethanes

  • Silicones

  • Wood, Baseboards, Windows & Door casing

  • Plumbing Fixtures

  • Polyurethane's

  • Silicone's

    Perfect long lasting sealants for virtually all your building and remodeling needs.

SOUDAL®

Swipex

Super cleaning wipes

Professional Quality

SOUDAL - SWIPEX

Swipex are solvent based cleaning wipes for uncured sealants & adhesives.

  • Non woven wipes impregnated with a mixture of solvents, biodegradable non-ionic surfactants and skin emollients

  • Suitable for all non-porous surfaces.

NOVAGARD

NOVAFLEX

Super cleaning wipes

Professional Quality

NOVAFLEX - Multi Purpose Adhesive Sealant

NovaFlex Multi-Purpose Adhesive sealant is an odorless, all-weather silicone that completely cures in a couple of days, and remains flexible to resist cracking, mildew, and discoloration for years to come.

  • Great for exterior and interior sealing

  • Permanently flexible

  • Will not shrink or crack

  • Waterproof

  • Superior UV resistance

  • Tack-Free in 10 min., completely cured within 48hrs.

  • No solvents or odor

  • Will not freeze

  • Excellent adhesion to most building substrates

  • Easily gunned at all temperatures.

    AAMA Verified

SOUDAL/BOSS

FOAM GUNS, CAULK GUNS, SAUSAGE GUN

Get In Touch

Address

MK Building Materials

916 N. Main St.

Orange, CA 92867

Walk-Ins Welcome.

(714) 660-6062

(714) 822-1875

Hours

Mon – Fri 7:30am – 4:00pm

Sat - Sun – CLOSED

916 N Main St, Orange, CA 92867, USA